Exhibitor Services Manual World’s Largest International Conference and Exhibition for Semiconductor Manufacturing and Materials SEMICON Japan 2014 December 3 (Wed) 5 (Fri) Tokyo Big Sight - East Exhibition Halls Conference Tower www.semiconjapan.org 1. Exhibition Overview Event: Organizer: Venue: Dates and Times: Price of Admission: Website: SEMICON Japan 2014 SEMI Japan 4-7-15 Kudan-minami, Chiyoda-ku Tokyo 102-0074 Tel: +81-3-222-6022 (Exhibition) Fax: +81-3-222-5757 Tokyo Big Sight (Tokyo International Exhibition Center) East Exhibition Halls 1-5 3-10-1 Ariake, Koto-ku Tokyo, Japan 135-0063 TEL: +81-3-5530-1111 http://www.bigsight.jp/english/ December 3 (Wed), 4 (Thu), 5 (Fri), 2014 10:00 – 17:00 Free (with pre-registration) www.semiconjapan.org/ 2. Area Map and Access Info / Parking (1) Exhibition Venue Area Map (TQPVKGT$NFI 6GTOKPCN (2) How to get to Big Sight 11 (3) Parking Parking Lot Total Spaces Hours Cost Notes 1. East Hall Underground Parking 191 8AM-10PM ¥250/30min ¥2000 max./day 2. Conference Tower Underground Parking 62 8AM-10PM ¥250/30min ¥2000 max./day 3. West Hall Outdoor Parking 308 7AM-11PM ¥250/30min ¥1500 max./day 4. Times Ariake Central Tower 239 24hrs (weekdays) Mon-Fri ¥300/30min Sat/Sun/Holidays ¥400/30min 5. Times Ariake Frontier Building 142 7AM-11PM ¥400/30min ¥1500 max./day till midnight ¥1400 max./day The East Hall Underground Parking Area is the closest lot to the halls, and always fills up quickly. Plan to arrive early if you want a spot here. The number of spaces available may change depending on the exhibition and traffic conditions. All prices shown include tax. For more detailed information on parking lots 4 and 5, contact the operating company directly. 5. Times Ariake Frontier Building 4. Times Ariake Central Tower Ariake Entrance/Exit for Expressway 2. Conference Tower Underground Parking Area 1. East Hall Underground Parking Area 3. West Hall Outdoor Parking Area 12 4 Move-in and Move-out Vehicle permits are required during both the move-in and move-out periods. During these hectic and confusing periods we ask for the full cooperation of every exhibitor and their contractors to make the process as trouble-free as possible. (1) Move-in and Move-Out Schedules Dec 1 (Mon) 8:00 – 24:00 (Vehicle entry until 20:00) Dec 2 (Tue) 8:00 – 22:00 (Vehicle entry until 14:00) Move-out: Dec 5 (Fri) 17:00 – 22:00 (Vehicle entry from 19:00) ※ Move-out only permitted on the last of the exhibition. No work allowed on Dec 6 (Sat). Move-in: ※ Take careful note of the charged overtime periods indicated below for move-in and exhibition period. Any work performed at these times indicated by will be charged by the hour. 8 9 10 11 Dec 1 (Mon) 8:00 start 12 13 14 15 16 17 18 19 20 21 22 24 24:00 close Exhibit Construction/Move-in Dec 2 (Tue) 8:00 start 23 22:00 close Rehearsals 24:00+ 22:00+ 9:40 Opening Ceremony (prospective) 8:00 Dec 3 (Wed) Exhibitors Enter 10:00 open General Exhibition 17:00 close 18:00+ 8:00 Dec 4 (Thu) Exhibitors Enter 10:00 open General Exhibition 17:00 close 18:00+ 8:00 Exhibitors Enter 10:00 open General Exhibition 17:00 close Tear-down/Move-out Dec 5 (Fri) 22:00 free overtime charged overtime 17:15 Shutdown Electricity/Water/Air ※ During the Rehearsal period on December 2 (Tue), construction work within the booths is permitted, but no vehicles will be permitted to enter the halls. Work Periods • December 1 (Mon) 8:00 – 20:00 • December 2 (Tue) 8:00 – 18:00 • December 3 (Wed) 8:00 – 10:00 • December 4 (Thu) 8:00 – 10:00 • December 5 (Fri) 8:00 – 10:00 Free Overtime Work Periods (after regular work periods) To work during the free overtime periods noted on the schedule above, apply to the Show Management Office on the same day by 17:00. However, on December 1 (Mon) only, you have until 19:00 to apply. Charged Overtime Work Periods Work during the following periods will be charged an overtime rate of ¥50,000/hour per company (tax not included): December 1 (Mon) – after 24:00 December 2 (Tue) – after 22:00 December 3 (Wed) – after 18:00 December 4 (Thu) – after 18:00 You will be billed for this overtime after the exhibition. Furthermore, if you need to work overtime, you must first submit an Overtime Application to the Show Management at least 30 minutes before the overtime period. No one will be permitted to work overtime without permission. However, there is no overtime charge for contractors or employees staying late to get equipment set up in the booth (real products and equipment brought in for display). If you find yourself in this situation, inform the Show Management Office of the fact when you submit your overtime application. When finished with overtime work, please notify the Office. If no notice is given, the exhibitor may be charged for overtime up to 8:00 the following morning. ※ Vehicle entry is permitted into the halls during the following periods: December 1 (Mon) – until 20:00 December 2 (Tue) – until 14:00 December 5 (Fri) – after 19:00 53 • Move-In Routes 2014䝻䝂 Yurikamome Line Rail Yard Iron Gate West Hall 1 East 4 Gate East Hall 3 East Hall 2 East Hall 1 East 1 Gate Tokyo Big Sight East Exhibition Hall Waiting Area 2 East Hall 6 East Hall 5 West Hall 2 East Hall 4 Yurikamome Line Kokusai Tenjijo Seimon Station Tokyo Big Sight Mae East 7 Gate Truckyard Tokyo Ariake Frontier Fashion Town Bldg. (TFT) Bldg. Ariake Washington Hotel Waiting Area 1 East Promenade Cancer Institute Hospital Center Promenade Ariake Station Rinkai Line Kokusai Tenjijo Station ͤ During Move-in vehicle entry/exit is through the Iron Gate Vehicle Move-in Schedule Date Vehicle Reception Move-In Dec 1 (Mon) 7:00 – 19:30 8:00 – 20:00 Dec 2 (Tue) 7:00 – 19:30 8:00 – 18:00 ※ Vehicle entry is not permitted after 14:00 on Tuesday, December 2 because of rehearsals. Vehicle Entry Procedure Enter at Iron Gate East Gate 4 or 7 Truckyard Unload, then move to Waiting Areas 1 • Early Move-in Exhibitors with booths of size 12 booth units or larger in East Halls 1, 2, or 3, who wish to begin move-in early, should contact the Show Management (Sakura International, Inc.) by October 23 (Thu). The office will send you an Early Move-In Application to fill out. Upon receiving your application the office will assess the overall situation, then you will be notified of the result. Furthermore, due to the nature of the exhibition hall layout, exhibitors in halls 4 and 5 will not be able to participate in early move-in. • VIP Vehicles VIP vehicles and vehicles used by the Show Management are required to enter at East 1 Gate. < Contact > SEMICON Japan Show Management Support (Sakura International, Inc.) Fukagawa Sanwa Bldg 4F, 2-5-9 Monzennaka-cho, Koto-ku, Tokyo, Japan 135-0048 Tel: 81-50-5804-1281 Fax: 81-3-5646-1161 Email: semicon2014@sakurain.co.jp Business hours: Daily 9:30 – 17:00 (closed weekends/holidays) No Vehicle Parking at Exhibition No parking is permitted inside or around the exhibition halls. Once unloaded, vehicles must quickly exit the halls. Furthermore, vehicles not directly participating in move-in/move-out must not park in the waiting areas, but must use regular paid parking lots. 54 (2) Move-out Move-out Routes 2014䝻䝂 Yurikamome Line Rail Yard Iron Gate West Hall 1 East 4 Gate East Hall 3 East Hall 2 East Hall 1 East 1 Gate Tokyo Big Sight East Exhibition Hall Waiting Area 2 East Hall 6 East Hall 5 West Hall 2 East Hall 4 Yurikamome Line Kokusai Tenjijo Seimon Station Tokyo Big Sight Mae East 7 Gate Truckyard Tokyo Ariake Frontier Fashion Town Bldg. (TFT) Bldg. Ariake Washington Hotel Waiting Area 1 East Promenade Cancer Institute Hospital Center Promenade Ariake Station Rinkai Line Kokusai Tenjijo Station Move-out vehicle entry/exit is through the Iron Gate. ※ During ͤ During Move-in vehicle entry/exit is through the Iron Gate Move-out Vehicle Schedule Date Vehicle Reception Move-out Dec 5 (Fri) 8:00 – 22:00 17:00 – 22:00 ※ Vehicle entry into halls allowed after 19:00 on Friday December 5. Move-out Vehicle Entry Procedures For Priority Vehicles Enter at Iron Gate 8:00 – 15:00 To Truckyards Follow Security Instructions for Truckyard Parking Leave immediately after loading finished For Regular Vehicles ※When entering the Truckyards or Halls Enter at Iron Gate Move to Truckyards in ticket order Receive ticket at Waiting Area 2. Operations allowed 17:00 – 22:00 on Dec 5 ※When Hand-Carrying Items Out Without Vehicle Entering the Truckyards or Halls Enter at Iron Gate Hand-carry items to vehicle Go to Waiting Area 1 55 Operations allowed 17:00 – 22:00 on Dec 5 Move-Out Times (Priority Vehicle Permit Holders) Valid only for 8:00 – 15:00 on December 5 (Fri). Vehicles with this permit should come to the Truckyards between 8:00 – 15:00 on this date. Vehicles which do not enter by 15:00 may encounter delays. Vehicles without these permits must go to the waiting areas only. Move-Out Times (Regular Vehicle Permit Holders) Vehicles with this permit will be directed to the waiting areas. At the waiting areas the vehicle will receive a numbered ticket. Vehicles are allowed into the exhibition hall in order of their ticket numbers. No vehicles permitted in the exhibition hall without a numbered ticket. ※ We will send out the priority permits around mid-November. The number of permits allotted depends on the size of the exhibitor booth. We do not send out regular vehicle permits. Please download and copy the number of permits needed from your Exhibitor MyPage. Don’t forget to write on the permit the following information: Exhibitor, Contractor, Booth Number. Priority Vehicle Permits Regular Vehicle Permits 30+ booth units 3 11+ booth units 2 1-10 booth units 1 Download and print out as many copies as needed from your Exhibitor MyPage. PRIORITY VEHICLE PERMIT (xx HALL) VALID PERIOD: BOOTH NO. EXHIBITOR ENTRY GATE: WORKING FIRM REGULAR VEHICLE PERMIT (xx HALL) To enter exhibition area, both this permit and a numbered ticket are required. VALID PERIOD: BOOTH NO. EXHIBITOR ENTRY GATE: WORKING FIRM Sample Vehicle Permits (3) Sending Packages by Courier When sending products and printed materials to your booth by courier or package delivery service, specify a delivery time when booth personnel will be on hand to accept parcels, and clearly label packages with the exhibition name, the booth number, and exhibitor name. Courier services do not require a vehicle permit to deliver packages. ※ The Show Management Office will not accept any packages for delivery. Sample Package Labelling Big Sight East Halls 3-10-1 Ariake, Koto-ku, Tokyo, Japan 135-0063 SEMICON Japan 2014 East X Hall Booth XXXX Exhibitor: X Company Recipient: Mr./Ms. XXX Cell phone: XXXX (4) Important Points to Remember During Move-Out Vehicles must have a Vehicle Permit to enter the exhibition area. No entry for vehicles over 45 tons (vehicle + load weight). Vehicle speed inside halls must not exceed 10km/hour. When unloading vehicles, unload and drive away ASAP: do the time-consuming tasks of unpacking and sorting inside the booth. If it’s necessary to park or idle in the halls, make sure to always leave a passage space (width of at least 3 meters) for other vehicles to pass by. Please avoid the use of cranes. If at all possible, use the Nippon Express forklifts provided by the Management. Do not leave any materials in the aisles or the booths. Remove all materials when finished. There are no areas set aside to drop off empty containers inside the halls. Please remove all containers brought inside from off the premises. You can arrange for Nippon Express to remove containers by calling 81-3-3778-8274 (ask for Mr. Ukon or Mr. Shioda). There is no parking allowed during move-in and move-out at the waiting areas, truckyards, or in the exhibition halls. As soon as unloading is finished, immediately remove the vehicle from the exhibition area. No move-in or move-out activities are allowed during the exhibition itself. If equipments or products on display break down or need replacement, or materials for demos, or catalogs and other printed materials need to be restocked, contact the Show Management Office for advice. While move-in or move-out activities the manager in charge of the exhibition should be at your booth. During the exhibition period, December 3-5, vehicle permits are not used. If you need to bring a vehicle into the exhibition area, go to one of the entry gates, explain the matter to the security personnel there, and follow their instructions. Courier and package delivery firms do not require vehicle permits to enter the exhibition area. The Organizer and Show Management will not be responsible for any accidents occurring on site. Please drive carefully. 56 (5) Unloading from Crane Trucks (10 tons and above) If a 10-tons or greater capacity crane is required to unload exhibit items in the exhibition hall, we ask that you let our designated shipper, Nippon Express, do it for you. However, you are not limited to the designated shipper only. (6) Designated Shipper – Nippon Express The Show Management has contracted Nippon Express to be the designated shipper for the show. You can arrange shipping with them by calling 81-3-3778-8274 (ask for Mr. Ukon or Mr. Shiota). 5 Freight Handling/On-site Heavy Equipment Optional MyPage “Domestic Parcel Service/ Heavy Equipment” Deadline: November 13 (Thu) Nippon Express will be on-site to facilitate conveyance of materials and equipment during move-in and move-out. Contracting with Nippon Express to handle all your shipping needs will lower costs and free your staff of more important tasks. (1) Total Move-in/Move-out Shipping Service Full Coverage Shipping (handling of precision instrumentation) Contact Nippon Express for a direct quotation. (2) Prices for On-Site Cargo Handling Personnel and Equipment Costs for Forklift and Operator (tax not included) Personnel/Forklift Personnel (1) Price ¥3,500/hr 2.5 tons forklift (1) ¥10,000/first 30 min, ¥5,500/every 30 min after 6 tons forklift (1) ¥20,000/first 30 min, ¥12,000/every 30 min after 10 tons forklift (1) inquire Crane inquire Costs for move-in and move-out operations. Included in these prices are: 1. all necessary operations outside the charged times, and 2. operator for forklift/crane • Prices for Cargo Loading/Unloading (tax not included) Weight (kg) Price up to 499 ¥5,000 500 - 999 ¥10,000 1,000 - 1,999 ¥15,000 2,000 - 2,999 ¥15,000 + ¥5,000 for every extra 500kg Costs indicated are for each individual package moved during move-in/move-out. Prices include: 1. all necessary operations outside the charged times 2. delivery to booth 3. wrapping/unwrapping 4. carriage into/out of booth • Empty Container Storage (tax not included) Minimum price: ¥6,000 ¥4000 per cubic meter ※ Price includes removal of container from booth, storage during exhibition, and return of container to booth after exhibition. (3) Quotations Download the “Domestic Parcel Service/Heavy Equipment” application from your Exhibitor MyPage and fax or email it to Nippon Express. Nippon Express will then send you a quotation. When you are ready to order, contact them again. 57 7 Application Procedure for Booth Decoration/Furnishing The form to use and the deadlines to meet when applying will differ depending on the type of booth and additional furnishings. Use the flowchart below to determine what applications you need to submit and when, then submit all relevant applications by the deadline. The Organizer only rents space at the exhibition. Except for a part the pavilion exhibits, exhibitors are responsi ble for all walls and panels, additional decorations, and the installation of electrical wiring within the booth. Keep this in mind as you refer to the flowchart. Ordering a Package Booth Constructing Your Own Booth If you have ordered a package booth, the Show Management will assume all responsibility for shipping and installation. In this case the exhibitor is responsible for compliance with all relevant regulations and restrictions. Basic Package Premium Package Pavilion Plan Mandatory Mandatory 10/23 (Thu) Booth Decoration/Package Booth ※Exhibitors with a 2m x 1m pavilion booth do not need to submit. Let Show Management know if you plan any special decorations. Optional 10/23 (Thu) Additional Booth Decoration/Rental Furnishings * Mandatory for ALL Exhibitors 10/30 (Thu) Electric Supply and Installation Other Optional Submissions 10/23 (Thu) Anchor Bolt Drilling Ceiling Construction Naked Flame and Hazardous Materials 10/30 (Thu) Water and Air High Speed Internet and Telephones In-Booth Electrical Installation 11/13 (Thu) Rental PC Booth Cleaning Customs Clearance Domestic Parcel Service/Heavy Equipment Virtual Booth Publication Service Barcode Readers 59 10/23 (Thu) Booth Decoration 8 Standard Exhibition Package Booths Contact Information FCFS SEMICON Japan Show Management Support (Sakura International, Inc.) Tel: 81-50-5804-1281 Fax: 81-3-5646-1161 Email: semicon2014@sakurain.co.jp Business hours: Daily 9:30 – 17:00 (closed weekends/holidays) MyPage Package Booths/Additional Furnishings/Rental Options Deadline: October 23(Thu) (1) Basic Plan (General Exhibition Type) We can provide a basic booth package with minimal accoutrements which you can customize as needed. Choose whichever fits your needs and budget. ※ Package booths will be delivered at 8:00 on the morning of December 2 (Tue). ※ If you wish to cancel a package booth order, do so in writing and submit by November 20 (Thu). If cancelling after November 21 (Fri), a cancellation fee equal to 100% of the booth price will be applied. Typical 1 Unit Basic Booth ▪ 1 Booth Unit Typical 2 Unit Basic Booth ¥100,000 (tax not included) 2-plug outlet Back/Side Panels (white) 1 set Pole Frame (silver) Parapet 1 set Company Name (W1800xH200, white) *Japanese/English Black Gothic Font 1 Punch Carpet *choose color (red, orange, green, blue, gray, black) 9m2 Reception counter (H800xW900xD450) 1 Pipe Chair 1 - Electrical Installation Fluorescent lighting (40W) 2 Electric outlet (100V, 880W) for 2 plugs 1 Main Electric Installation (100V) 1kW Electric Utility Fees 1kW ※Corner booths do not feature wall partitions on aisle facing sides. The parapet and the company name come together as a set ▪ 2 Booth Unit inner dimension 950 pole 䃥40 Floor: punch carpet modular panel pipe chair reception counter ¥190,000 (tax not included) parapet 2-plug outlet fluorescent lighting company name 2-plug outlet Back/Side Panels (white) 1 set m Pole Frame (silver) ᯛ inner dimension Parapet (white) 1 set ᯛ 950 Company Name (W1800xH200, white) pole 䃥40 *Japanese/English Black Gothic Font 1 Punch Carpet *choose color Floor: punch carpet (red, orange, green, blue, gray, black) 18m2 ⅉ Reception counter (H800xW900xD450) 1 ಶ Pipe Chair 1 kW ྎ - Electrical Installation pipe chair ⬮ Fluorescent lighting (40W) 4 modular panel kWreception counter Electric outlet (100V, 880W) for 2 plugs 2 parapet fluorescent lighting company name kW Distribution Panel Installation 2kW Main Electric Installation (100V) 2kW ※Please do not use nails, pushpins, or strongly adhesive tape on the booth walls. To hang panels use chain hooks or Velcro tape (extra charge, see page 67.) Electric Utility Fees 2kW ※ Corner booths do not feature wall partitions on aisle facing sides. The parapet and the company name come together as a set. 60 (2) Premium Package (General Exhibition Type) A special package that will help you stand out from the crowd. You can raise the front panel up to 3.2m to make your company name highly visible even from a distance. Choose whichever fits your needs and budget. ※If you wish to cancel a package booth order, do so in writing and submit by November 20 (Thu). If cancelling after November 21 (Fri), a cancellation fee equal to 100% of the booth price will be applied. Typical 1 Unit Premium Booth ▪ 1 Booth Unit Typical 2 Unit Premium Booth Back/Side Panels/Parapet *choose color (red, orange, green, blue, gray, black, white) 1 Pole Frame (silver) Company Name (W1800xH500, white, large) *Japanese/English Black Gothic Font 1 Punch Carpet *choose color (red, orange, green, blue, gray, black, white) 9m2 Reception counter (H800xW900xD450) 1 Pipe Chair 1 - Electrical Installation Fluorescent lighting (40W) 2 Arm Spotlight (LED Reflex bulb) 2 Electric outlet (100V, 680W) for 2 plugs 1 Main Electric Installation (100V, up to 1kW) 1kW Electric Utility Fees (up to 1kW) 1kW ※ Corner booths do not feature wall partitions on aisle facing sides. The parapet and the company name come together as a set. ▪ 2 Booth Unit 2-plug outlet ¥170,000 (tax not included) arm spotlight 内々寸 法 inner dimension 950 pole φ40 Floor: punch carpet pipe chair reception counter modular panel company name parapet fluorescent lighting ¥330,000 (tax not included) Back/Side Panels/Parapet *choose color (red, orange, green, blue, gray, black, white) 1 Pole Frame (silver) Company Name (W1800xH500, white) *(Japanese/English) Black Gothic Font 1 Punch Carpet (choose from red, orange, green, blue, gray, black, white) 18m2 Reception counter (H800xW900xD450) 1 Pipe Chair 1 - Electrical Installation Fluorescent lighting (40W) 4 Arm Spotlight (LED Reflex bulb) 4 Electric outlet (100V, 680W) for 2 plugs 2 Main Electric Installation (100V) 2kW Electric Utility Fees 2kW pipe chair ※ Corner booths do not feature wall partitions on aisle facing sides. The parapet and the company name come together as a set. reception counter 2-plug outlet arm spotlight 2-plug outlet inner dimension 内々寸法 950 pole φ40 Floor: punch carpet modular panel parapet fluorescent lighting company name ※Please do not use nails, pushpins, or strongly adhesive tape on the booth walls. To hang panels use chain hooks or Velcro tape (extra charge, see page 67.) 61 9 Specialty Pavilion Package Booths SEMICON Japan Show Management Support (Sakura International, Inc.) Contact Optional Tel: 81-50-5804-1281 Fax: 81-3-5646-1161 Email: semicon2014@sakurain.co.jp Business hours: Daily 9:30 – 17:00 (closed weekends/holidays) MyPage Package Booths/Additional Furnishings/Rental Options Deadline: October 23(Thu) ※ Package booths will be delivered at 8:00 on the morning of December 2 (Tue). ※ If you wish to cancel a package booth order, do so in writing and submit by November 20 (Thu). If cancelling after November 21 (Fri), a cancellation fee equal to 100% of the booth price will be applied. (1) Types of Pavilion Package Booths 2m (W) X 1m (D) X 2.7m (H) 2m (W) X 2m (D) X 2.7m (H) 3m (W) X 3m (D) X 2.7m (H) (2) Description of Pavilion Package Booth Components 2m (W) X 1m (D) X 2.7m (H) (Exhibition price includes all the following components.) Back/Side Panels (white) 1set Electrical Installation Some Side Panels colored*designated pavilion color 1set Fluorescent lighting (40W) Parapet, Pole Frame (silver) Electric outlet (100V, 940W) for 2 plugs 1set 1 1 Company Name (W1500xH400) Main Electric Installation (100V) 1kW * in designated Pavilion color Electric Utility Fees 1kW Japanese/English Gothic Font 1 Punch Carpet * (in designated Pavilion color) 2m2 Display Stand (with storage in the lower part) W990 X D700 X H770 White 1 1 300 Pipe Chair Built-in Built-in 2-plug outlet (integrated stand) walland anddisplay display stand) 2-plug outlet (integrated wall Modular counter Modular counter pipe chair chair pipe Floor: punch Floor: punchcarpet carpet fluorescent lighting fluorescent lighting parapet parapet companyname name company Stars (( ))in Stars indiagram diagramabove abovedenote denote where where side sidepanels panelsand andcarpeting carpeting will will conform to designated pavilion color. conform to designated pavilion color. ※ Corner booths do not feature wall partitions on aisle facing sides. ※Please do not use nails, pushpins, or strongly adhesive tape on the booth walls. To hang panels use chain hooks or Velcro tape (extra charge, see page 67.) 62 1980 P:;P';P+ ¥80,000 (tax not included) Exhibition cost is for space only. (Corner booths do not feature wall partitions on aisle facing sides. The parapet and the company name come together as a set.) Back/Side Panels (white) 1 set Electrical Installation Some Side Panels colored designated pavilion color 1 set Fluorescent lighting (40W) 1 Parapet, Pole Frame (silver) 1 set Electric outlet (100V, 940W) for 2 plugs 1 Company Name (W1500xH400) Main Electric Installation (100V) 1kW * in designated Pavilion color Electric Utility Fees 1kW Japanese/English Gothic Font 1 Punch Carpet (*in designated Pavilion color) 4m2 Reception Counter (H800 X W900 X D450) 1 Pipe Chair 1 2-plug outlet Floor: punch carpet pipe chair reception counter parapet fluorescent lighting company name Stars ( ) in diagram above denote where side panels and carpeting will conform to designated pavilion color. 1980 P:;P';P+ ¥110,000 (tax not included) Exhibition cost is for space only. (Corner booths do not feature wall partitions on aisle facing sides. The parapet and the company name come together as a set.) Back/Side Panels (white) 1 set Electrical Installation Some Side Panels colored designated pavilion color 1 set Fluorescent lighting (40W) 2 Parapet, Pole Frame (silver) 1 set Electric outlet (100V, 880W) for 2 plugs 1 Company Name (W1500xH400) Main Electric Installation (100V) 1kW * in designated Pavilion color Electric Utility Fees 1kW Japanese/English Gothic Font 1 Punch Carpet (* in designated Pavilion color) 9m2 Reception Counter (H800 X W900 X D450) 1 Pipe Chair 1 2-plug outlet Floor: punch carpet pipe chair reception counter parapet fluorescent lighting (2) company name 2970 Stars ( ) in diagram above denote where side panels and carpeting will conform to designated pavilion color. ※Please do not use nails, pushpins, or strongly adhesive tape on the booth walls. To hang panels use chain hooks or Velcro tape (extra charge, see page 67.) 63 10 Additional Booth Decoration Furnishings Optional MyPage “Package Booths/Additional Furnishings/Rental Options” Deadline: October 23 (Thu) We have revised our booth furnishings offerings for this year’s exhibition. If you don’t find what you need on this page, contact the Show Management to arrange rental of additional items. .※ All prices listed below do not include tax. Display Counter (with storage) Display Counter (with storage) ¥23,400 A: W990 x D495 x H770 B: W990 x D495 x H1020 Display Counter (with storage) ¥24,700 ¥26,000 A: W990 x D700 x H770 B: W990 x D700 x H1020 Type A shown Type A shown Sliding doors on back of 1020mm high section Flat Shelf (standard installation height 1100mm) Display Counter (L- type) ¥19,500 ¥39,000 A: W990 x D900 x H770 B: W990 x D990 x H1020 Type A shown Display Counter (step type) Display Counter (step type) ¥32,500 ¥5,200 Door (with key) ¥35,000 A: W990 x D990 x H770 B: W990 x D990 x H1020 Load: 5kg additional shelves ¥2,600 each (tax not included) Type A shown Folding Door (with key) ¥28,000 Color Sheet for Wall Panel Wall panel (white) ¥13,000 ¥9,000 Graphic Sheet for Wall Panel ¥39,000 Please specify desired color Color send in all graphics data needed to print Submit graphics data by email in: Illustrator (CS4 or less) Outline Font format. Black Grey Blue Green Red Pink Orange Yellow Beige Brown Single side Company Name Board ¥13,000 Materials: Inkjet printing on styrene board EODFNOHWWHULQJ*RWKLFIRQW on white background HLWKHU-DSDQHVHRU(QJOLVK Company Name Board (with logo) Sign Board ¥19,500 ¥26,000 Materials: Inkjet printing on styrene board Logo Added to Company Name Board on Package Booth ¥6,500 Materials: Inkjet printing on styrene board logo on white background (send in full data) Submit graphics data by email in: Illustrator (CS4 or less) Outline Font format. black lettering (Gothic font) on white background for other options, contact us for quotation 64 logo (send in full data) Submit graphics data by email in: Illustrator (CS4 or less) Outline Font format. MyPage “Package Booths/Additional Furnishings/Rental Options” Optional Deadline: October 23 (Thu) ※ All prices listed below do not include tax. Velcro Tape (4 pcs./set) Chain & Hook (2 pcs./set) ¥650 Panel Holder (4 pcs./set) ¥650 Punch Carpet 9m2 ¥2,600 ¥26,000 Detachable (panel side) 5∼7 50 50 x4 15 x4 30 Black Grey Blue Green Red Pink Orange Yellow Beige Brown Velcro tape 40 25 15 Please specify desired color Color 1000 Detachable (wall side) 65 00 30 30 00 11 Booth Regulations MyPage “Booth Decoration” Mandatory Deadline: October 23 (Thu) (1) Construction by the Organizer The organizer will mark off booth spaces with tape on the floors of the exhibition halls to indicate booth placement. The organizer only rents space to the exhibitor, and will not build basic partitions (back and side panels separating booth from other exhibitors) between booths. Company B Company A 3m • Standard Partitioning with Neighboring Booths 3m Company E Company F Company C Company D Company G Tape (Aisle) • Island Booth (Aisle) Company H (Island booth) (2) Construction by the Exhibitor The following 3 items of construction/decoration must be undertaken at the exhibitor’s expense. Partitions between exhibitors Always build a separating partition between your booth and neighbors. Use only fire-retardant materials, and the height must be at least 2.7m and less than or equal the upper limit allowable. Company Signs (see page 71 for a discussion of company signage). Display the name of the exhibitor in an easily seen location. Floor coverings (carpeting) Carpet the floor of your booth to make it easily distinguishable from the aisles. Use only fire-retardant materials for carpeting. (3) Specifications for 1 Booth Space The size of 1 booth space unit is W 3m x D 3m. All display and decoration must be limited to the confines of the exhibitor’s rented booth space only. (some booths may have slightly different dimensions but the exhibitor must still comply with the relevant restrictions for that booth size.) * These restrictions do not apply to the booth number signs put up by the Show Management Office (see (4) below) nor to the integrated design of the pavilions designed by this Office. (4) Booth Number Display The Show Management will create and install booth number display panels that stick out above each booth. If a neighboring booth abuts the exhibitor’s booth, the other side of the panel will display the other exhibitor’s booth number. We will supply display panels for island booths, but in this case the exhibitor should install the panels in prominent, easily-seen locations. The NEW/DEMO/REAL marks have the following meanings. Register 300mm your products with these symbols on the Exhibitor Search Data Upload page of MyPage. 1000 150mm NEW Mark REAL Mark Booth Number DEMO (red) New products and technologies on display (green) Real products on display (blue) Live demos in booth. Mark 66 (5) Exhibitor Construction Period December 1 (Mon) 8:00—20:00 December 2 (Tue) 8:00—18:00 ※ Exhibit items should be brought in during this period. ※ Please register your contractors through your Exhibitor MyPage “Booth Decoration” (6) Booth Regulations Height Restrictions 1) Regular Booth Areas A: Booths located along the walls (back and side walls) 6 m or less B: All others 4.5 m or less However, condition A above (6m or less height) applies only to island booths of 4 units in size (6m x 6m) or larger. Exhibition wall (Move-in gate side) aisle aisle aisle aisle aisle B: All others A: Booths along walls 2) Pavilion Areas booth size 2m x 1m 2.7m or less booth size 2m x 2m 2.7m or less booth size 3m x 3m 4.5m or less Required Open Spaces at the Booth Entrance When walls or booth design elements face the aisles (distance to aisle 1m or less), at least 1/3 of the wall or design element length must be left open. exhibition hall wall length 1/3 or more open neighbor booth length 1/3 or more open length 1/3 or more open length 1/3 or more open length 1/3 or more open length 1/3 or more open length 1/3 or more open length 1/3 or more open neighbor booth length 1/3 or more open length 1/3 or more open length 1/3 or more open length 1/3 or more open 67 length 1/3 or more open ※ However, this does not apply to those areas which are higher than 2.7m (up to the height limit). [例] No need for opening in this area ※ This does also not apply to those areas of booths that face structural elements of the exhibition hall itself, such as the outer walls, or to exhibitors whose booth size is 2m x 1m. Emergency escape routes Each booth must have at least 2 passages, on 2 different sides of the booths, of at least a width of 1.2m, to facilitate exit in case of an emergency. (Exception: when in-line booths have one side open to the aisle, or corner booths of sizes 2m x 2m or 2m x 1m. Partitions between neighboring booths Erect single one-sided panel partitions between your booth and your neighbors of at least 2.7m in height and within height limits (without setback). The back side of partitions which exceed 2.7m in height and which will thus be exposed to the neighbor booth should be white and without printed patterns on them. (When partitions are of different height than the neighbor’s partitions, it is not permitted to feature graphics or text such as company names, when the partition is within 1 meter of the edge of a neighbor’s booth.) No use of spaces outside the booth All exhibitions and demonstrations must be confined to the booth interior. The rules below must be strictly followed. ※ Do not allow visitors to crowd the aisles in front of your booth. When using a stage or large projection equipment, design the booth so all viewers can comfortably watch from inside the booth. ※ It is not permitted to stand in the aisles to invite visitors into the booth, conduct surveys, explain products, or similar activities. ※ It is not permitted to project images from AV equipment on to surfaces outside the booth. Use of the Aisles by In-Line Booth Exhibitors When the booths of an exhibitor lie on either side of an aisle, and the exhibitor wishes to carpet the aisle area, contact the Show Management. You will be charged for the expense of carpeting. Your designs require prior approval by Management, so be sure to submit a layout plan before September 30 (Tue). No carpet can be laid in the aisles without prior approval of the Show Management. When laying carpet in the aisles, the following conditions apply. • The aisle can be used when the exhibitor has at least 2 booth units on either side of the aisle (at least 4 booth units total). • Carpeting in aisles between the booths, e.g. an in-line booth on both sides of an aisle, can display special designs including company logo and name. • Only punch carpeting can be used. Wood, rubber, tile and other materials cannot be used. • The cost of permission to use the aisles is calculated as: 25% of the entire carpeted-aisle area is added to the total booth area that the exhibitor has rented, and priced as such based on the booth unit price. • No materials or booth decoration/construction are allowed in the aisle area. • No exhibits, demos, or sales activities permitted in the aisle area. • Aisle space is determined solely by the Show Management. Exhibitors are not allowed to alter the shape of the basic booth unit (3m x 3m) or the shape of the aisles (bends, diagonals, etc.). There are exceptions when public safety is a concern. • No signage or constructions such as arches, parapets, etc., which span above the aisle are permitted. Carpeting can be laid down only after 15:00 on the last day of move-in, December 2 (Tue). • Please remove carpeting immediately after the end of the exhibition (December 5, 17:00 and after). ※ No carpeting can be laid in the main aisles (width 5-6m), which are emergency escape routes. 68 Display of Company Name Only the contracting exhibitor may display their company name within 1m of the border between the booth and the aisle. There are no restrictions on the display of co-exhibitor names, products, etc. in any area farther than 1m away from this border. Plumbing Occasionally water and compressed air hoses may unavoidably have to run behind or through certain booths. We appreciate your understanding if that is the case. Ceiling Construction Ceiling construction is as a matter of policy forbidden. However, if a ceiling is absolutely necessary to the display or demo of certain products, ceiling construction including a fire-retardant black-out curtain may be permitted. Prior application and approval is necessary in this case. If prior approval is not obtained the Fukagawa fire authorities may order the exhibit to be altered or even removed entirely from the site. You need to submit an application for ceiling construction which includes plans (floor and elevation plans), the reason for ceiling construction, and the materials to be used. Submit these documents to the Show Management by October 23 (Thu). 1) Constructions not considered to be part of a ceiling a. Louvers or nets (when 70% or more of the net is open space) 2) Conditions and Rules on Ceiling Construction a. Ceilings (excluding the exceptions in 1) directly above) can only be constructed if necessary to block light or dust from exhibits. b. After inspection of the plans, local fire authorities may require the exhibitor to install fire safety equipment inside the exhibit when the conditions of the exhibit and display warrant it. Exhibitor will bear all costs for these installations. c. Fire authorities will inspect the exhibition to see that it meets the instructions given as reflected in section b. above. If the installation meets their requirements, they will give final approval. The authorities may have questions to ask during the inspection, so personnel capable of properly explaining the design and installation should be present at this time. Approval of the booth will not be given if no such persons are present. d. If the exhibitor contemplates using any flooring of a height greater than 30 cm, this will require a separate discussion for prior approval. e. Double ceilings are not permitted. f. If any constructions or designs which are not pre-approved are discovered, the Show Management may require changes be made. 3) Submission and Consultation a. All ceiling designs which do not fall under the definitions of section 1) above require the consultation and approval of local fire authorities. Please submit the following documentation to Sakura International. • Booth construction plans (floor and elevation plans), and total floor plan (with black-out curtain areas and fire extinguishers clearly marked) • Detailed documentation of how the ceiling is constructed, and what materials are used (text descriptions as well as fire-retardant labelling etc.) b. Be aware that discussions with the fire authorities may take some time to complete. Two-storied Booths If the exhibitor wishes to construct a 2nd floor in the booth, only those exhibitors with an island booth of 30 booth units or more may construct a second storey in their booths. Plans and diagrams for this construction must be submitted beforehand for the approval of the local fire authorities. The exhibitor is also required to implement whatever safety measures the authorities have ordered to ensure the safety of the exhibit. 69 Fire Prevention Rules ※ The local Fukagawa fire authorities will make a fire prevention inspection on both the day before the exhibition, and the first day of the exhibition. If any exhibitor is found to be in violation of the rules below, they may be required to tear down their exhibit. ※ Article 8 Section 3 of the Japanese Fire Service Act, concerning structures requiring fire and catastrophe prevention, applies to the Tokyo Big Sight venue. Thus, exhibitors at the venue are required to follow fire prevention rules in their exhibits. 1) Paneling used in booth construction must be made of fire-retardant materials. All plywood and printed veneer plywood, regardless of thickness, must be treated by immersion soaking of fire-retardant chemicals. Paneling treated only by a superficial spray-on of fire-retardant chemicals is not permitted. Not only the partitions, but all surfaces made of paneling such as booth displays, reception counters, shelves, etc., must be made of this fire-retardant treated construction material. 2) Use of fire-retardant materials A: Objects requiring fire-retardant treatment a. Curtains b. Accordion partitions used as dividers c. Hanging decorative cloths on walls d. Cloth doorway hangers, black-out curtains etc. e. Projection screens f. Cloth blinds g. Carpets, rugs, artificial lawns, mats h. Sheeting B. Types of fire-retardant materials to use a. Fire-resistant materials as defined by Article 2 Section 9 of the Building Standards Act b. Semi-fire-resistant materials as defined by Article 1 Section 5 of the Order of Enforcement of the Building Standards Act c. Difficult to burn materials as defined by Article 1 Section 6 of the Order of Enforcement of the Building Standards Act 3) Please put 1 label on each piece of fire-resistant material used. A. Place the label of fire-resistant performance where it is easily seen. B. Attach the label so that it cannot be easily torn off. 4) Please do not use materials which are difficult to treat for fire-resistance. Make every effort to avoid the use of the following or similar materials or objects made out of petroleum or chemical materials: artificial flowers, urethane, acetate, polyester, styrofoam, acrylics and nylon. 5) Use materials designated as fire resistant by Japanese authorities. A: Use only imported objects and materials which fall under the definitions of section 1) and 2) above that have been designated as fire-resistant domestically in Japan. B: Imported objects and materials which are not labelled as fire-resistant must be submitted to the relevant Japanese authority for approval. 6) Prior approval must be obtained if the exhibitor plans to use open flame. Both during the move-in/move-out and the exhibition, if electric or gas welders or other flame-generating equipment will be used, prior approval must be obtained from the Show Management. Fire extinguishers should be kept close at hand when using such equipment. Removal of Materials at Show End All constructions and displays must be removed within the designated move-out period. Overtime is not permitted because this will interfere with preparations for the next show. 1) Exhibitors is responsible for removal of all trash from their booth areas. 2) If any displays or exhibits are left after the move-out period without prior approval, the Show Management will arrange clean-up and bill the exhibitor for the cost. 3) Exhibitor is responsible for removing all waste and trash generated by move-out operations. If anything is left behind, the Show Management will arrange clean-up and bill the exhibitor for the cost. 70 Restrictions on Large Project Devices When using video equipment greater than 100 inches, the front of the screen must be at least 5m away from the border of the booth and the aisle, and the side of the screen must be at least 2m away, as shown in the diagram below. Use of 100 inch+ projection screens is prohibited if these restrictions cannot be met within the booth. For projection screens smaller than 100 inches, make sure there is ample room for viewers inside the booth, and that viewers do not obstruct the aisles. Placement of Large Projection Screens aisle aisle aisle over 2m video equipment video equipment over 2m aisle ov er front 5m aisle over 2m aisle front ov er 5m over 5m over 2m aisle aisle over 5m front video equipment over 2m aisle aisle Narration Volume The volume of the narration generated inside a booth must not exceed 80 decibels at a distance of 2m from the booth border. Exhibition staff will be measuring volumes during the exhibition and will request volume reduction when this limit is exceeded. However, even if this limit is not exceeded, reduction may be requested if the volume causes distress in neighboring booths, or the general noise of the exhibition is causing visitor discomfort. It is forbidden to aim speakers and other voice amplification systems at the fronts of neighboring booths. When hanging speakers on walls and columns, the speakers should be angled down 45°. To avoid congestion in the aisle, invite attendees listening outside to enter the booth. The location of the speakers must be at least 1m away from the booth edges and must face inward. Lighting and Other Restrictions Lasers, strobe lights and similar lights are prohibited to prevent the possibility of eye damage. Smoke, foul odors and similar annoyances are prohibited in the booth. Show Management also reserves the right, at any time, to restrict or alter any constructions, demonstrations, or activities which, in their judgment, will impede the free flow of visitor traffic or cause annoyance and disturbance in neighboring booths. Examples of Regulatory Violations in Booth Construction and Decoration During construction Show Management personnel will be making the rounds on the exhibition floor to make sure that exhibit heights, wall structures etc. do not violate the basic restrictions as laid out in this manual. Non-compliant booths must be altered to conform to all restrictions before the exhibition begins. Exhibit components (lighting, speakers, etc.) exceed height restrictions. COMPANY NAME ・Speaker juts out from booth ・Speaker angled directly at aisle or neighboring booth Height Restriction Audiovisual equipment juts outfrom booth Lighting juts out from booth Audiovisual equipment juts out from booth Streamer or flag juts out from booth Display stand or exhibit juts out from booth • Submission of Booth Plans ※ All exhibitors not renting package booths must submit the plans of their booths By either regular mail, or email as a PDF, exhibitors must send in booth plans (floor plan and elevation plan) to the Show Management by October 23 (Thu). ※ If the organizer rules that the construction and decoration of a booth is in violation of these rules, the exhibitor will be required to make changes as necessary. This will also cause the loss of SEMI Priority Points, which will have a direct effect on the exhibitor’s ability to influence the placement of their booth at the next exhibition. ※ As a matter of policy, no changes to structures or remodeling is permitted once the exhibition has started. 71 Heavy Objects 1) Weight Limits on Exhibit Items The value of the total weight of any individual exhibit item, divided by the area of its footprint, cannot exceed 5t/m2. If the weight of any individual exhibit item exceeds 50t, please contact the Show Management for consultation. 2) Limits on Move-in and Installations Only vehicles with a total weight (vehicle weight + load) of 45t or less will be permitted entry in the exhibition area. The only crane vehicles allowed are rough terrain cranes with a load capacity of 45t or less. Do not place crane outriggers or heavy vehicles like trailers directly on the pit covers. The graph below shows the type of plate needed to stabilize the crane depending on size. Rough Terrain Crane Outrigger (see diagram below) up to 35 ton 500mm x 500mm steel outrigger plate (16mm thickness) up to 45 ton 500mm x 500mm + 1,000mm x 1,000m steel outrigger plate (16mm thickness) 35t Rough Terrain Crane Stabilize outrigger with 500mm x 500mm plate. 45t Rough Terrain Crane Stabilize outrigger with a 500mm x 500mm plate on top of a 1,000mm x 1,000mm plate on the bottom. 3) Restrictions Around Pit Areas If any objects weighing 3t or more are to be placed on or near a pit, the pit area must be reinforced as shown below. Restricted Area Reinforcing Plate Steel Plate 16mm or more thickness Pit Pit Before placing the heavy object within the restricted area of a pit, first cover the pit area with a steel plate to reinforce it. <Contact for Booth Rules Questions and Plan Submissions> SEMICON Japan Show Management Support (Sakura International, Inc.) Fukagawa Sanwa Bldg 4F, 2-5-9 Monzennaka-cho, Koto-ku, Tokyo, Japan 135-0048 Tel: 81-50-5804-1281 Fax: 81-3-5646-1161 Email: semicon2014@sakurain.co.jp Business hours: Daily 9:30 – 17:00 (closed weekends/holidays) 72 Optional Mandatory only for those applying MyPage “Anchor Bolt Drilling” Deadline: October 23 (Thu) Submit Required Documentation by Mail or Email Deadline: October 23(Thu) Floor Work (Placement of Anchor Bolts) To drill anchor bolt holes to secure equipment and structures to the exhibition floor, the exhibitor must first download and fill out the “Anchor Bolt Drilling” form, then fax the form and 2 sets of floor plans showing hole placement, by October 23 (Thu), 2014 to the Show Management Office. ※ If you need to know the locations of the equipment pits, contact the Show Management. (1) Placement and Drilling of Anchor Bolts The only type of bolt permitted to be placed must be 16mm or less in diameter, with a shaft sinkable to a depth of 60mm or less. (2) Cost of Anchor Bolts Flooring patching cost: ¥2,000/bolt (tax not included) You will be billed, after the exhibition ends, for the cost of floor repair for the area damaged for each anchor bolts used in your booth. (3) Restrictions on Floor Work no drilling into pit covers holes at least 200mm distance from pit edges no anchors other than bolt-type no concrete nails, concrete screws or dry bit rivets no digging into or abrading of floor. No use of strongly adhesive tape. no applying of paint or glue directly on floor no work, control or operations allowed without authorization on any exhibition structure Under no circumstances can the exhibitor do any of the above. If any exhibitor has been found to be violating these restrictions, a separate fee will be assessed, on top of the cost of the anchor bolts. (4) Floor Repair The exhibitor is responsible for repairing any floor area into which anchor bolts were sunk, immediately after the exhibition ends. Do not remove the protruding end of any anchor bolts. Cut off the protrusion with a sander. Do not hammer in or cut with a gas welder. If you do so, you will be billed for further repairs. If the exhibitor does not repair the floor as described here, the Show Management will repair the floor and bill the exhibitor for the cost. Placement of Anchor Bolt Removal (Floor Repair) Anchor Bolt Nut Washer Workpiece within φ16mm Cut horizontally until completely flat. within 60mm within φ16mm within φ17mm within 60mm within φ17mm <Contact for Plan Submissions> SEMICON Japan Show Management Support (Sakura International, Inc.) Fukagawa Sanwa Bldg 4F, 2-5-9 Monzennaka-cho, Koto-ku, Tokyo, Japan 135-0048 Tel: 81-50-5804-1281 Fax: 81-3-5646-1161 Email: semicon2014@sakurain.co.jp Business hours: Daily 9:30 – 17:00 (closed weekends/holidays) 73 12 Rental Furnishings MyPage “Package Booths/Additional Furnishings/Rental Options” Optional Deadline: October 23 (Thu) ※ All prices listed below do not include tax. Meeting set Meeting set ¥16,000 ¥10,000 Meeting set Meeting set ¥13,200 ¥6,560 φ600 φ600 470 800 500 710 450 550 450 770 450 740 450 600 [Chair] SIZE/W470×D500×H770×SH450 COLOR/SEAT: A red B green C blue [Chair] SIZE/W450×D550×H740×SH350 COLOR/SEAT: white, leather upholstery [Table] SIZE/φ600×H710 COLOR/TABLETOP: white Legs: silver (aluminum) [Table] SIZE/W800XD450XH600 COLOR/TABLETOP: white Legs: silver (aluminum) 1050 400 600 350 440 700 [Chair] SIZE/W400×D450×H850×SH700 COLOR/SEAT: white, leather sheet FRAME: chrome plated SIZE/φ360×SH440 COLOR/SEAT: white, leather Legs: chrome plated [Table] SIZE/φ600×H600 COLOR/TABLETOP: white Legs: silver (aluminum) C382+T113 [Chair] [Table] SIZE/φ600×H1050 COLOR/TABLETOP: white Legs: silver (chrome plated) C-237+T-129 ST-265 ST-009A φ600 Information counter Information counter ¥6,000 ¥10,000 Unit counter (w. shelf ) Dining table ¥10,000/¥12,000/¥16,000 ¥6,000 750 800 1200 940 685 900 450 450 900 SIZE/W900XD450XH800 COLOR/Countertop: white A: W1200 (W1200×D600×H940) B: W1500 (W1500×D600×H940) C: W1800 (W1800×D700×H940) COLOR/Tabletop: white 650 SIZE/W650×D450×H900 COLOR/Tabletop: white UN-106A UN-105 SIZE/W1200×D750×H685 COLOR/Tabletop: white Legs: silver (chrome plated) T-227 UN-109 、111 、113B Square table Small table ¥8,000 800 ¥10,000 ¥12,000 ¥16,000 Table ¥2,000 High table ¥3,200/¥3,200/¥2,400 ¥6,800 φ600 600 800 730 1050 600 680 SIZE/W800×D800×H680 COLOR/Tabletop: natural (laminated beech) Legs: silver (chrome plated) T-221 A: W1800 (W1800×D600×H730) B: W1500 (W1500×D600×H730) C: W1200 (W1200×D600×H730) COLOR/Tabletop: white Legs: silver (aluminum) A: SIZE/W800×D450×H600 B: SIZE/W600×D600×H600 COLOR/Tabletop: white Legs: silver (aluminum) T-213 、215 Round table T-232 、233 、234 SIZE/φ600×H1050 COLOR/Tabletop: white Legs: silver (chrome plated) T-129 Stacking chair Folding chair ¥4,800 ¥3,200 ¥3,200 ¥2,400 ¥640 Cafe chair ¥2,400 ¥2,800 φ7 5 0 880 780 700 450 430 430 460 T-124 SIZE/φ750×H700 COLOR/Tabletop: white Legs: silver (aluminum) C-370 SIZE/W460×D520×H880×SH430 COLOR/A: white B: black Legs: silver (chrome plated) 420 SIZE/W420×D420×H780×SH430 COLOR/Seat: blue (leather) Frame: silver (chrome plated) C-367 74 SIZE/W470×D500×H770×SH450 COLOR/ A: red B: green C: navy blue Frame: silver (chrome plated) C-009 Optional MyPage “Package Booths/Additional Furnishings/Rental Options” Deadline: October 23 (Thu) ※ All prices listed below do not include tax. Counter chair Counter chair ¥4,000 Steel rack ¥3,200 Table cloth (white) ¥6,000 ¥1,200 410 450 380 600 450 C-247 SIZE/W380×D410×H910×SH700 COLOR/Tabletop: black (leather) Frame: silver (chrome plated) 1800 700 500 430 700 SH430 SH500 A B SH600 SH700 C D 2200 450 COLOR/Tabletop: white (leather) Frame: silver (chrome plated) C-234 Showcase* UO-42 900 SIZE/W900×D450×H1800 COLOR/gray (steel) ¥20,000 ¥14,000 ¥10,000 600 600 600 Partition (Folding type with caster) Showcase* Showcase* ¥24,000 1000 UT-21 920 920 825 1730 900 1500 1800 SIZE/Outer:W1500×D600×H920 Inner:W1450×D530×H290 COLOR/black Lighting: slimline includes key G-37 SIZE/Outer:W1800×D600×H920 Inner:W1750×D550×H630 COLOR/white Lighting: slimline includes key G-46 Trash bin 25L SIZE/Outer:W900×D600×H825 Inner:W840×D550×H270 COLOR/white Lighting: slimline includes key G-48 Trash bin 13L ¥1,600 SIZE/W220×D391×H565 COLOR/A: green B: gray SIZE/φ240×H290 COLOR/A: white B: blue ¥4,000 SIZE/φ400×H1810 Black SIZE/W950×D450×950∼1700 COLOR/silver (chrome plated) M-57 M-55 Brochure rack Brochure stand ¥4,800/¥5,600/¥5,600 Coat rack ¥2,400 UO-131 Brochure stand PW-33A Single rack ¥640 UO-129 1800 SIZE/W1800×H1730 COLOR/ivory (aluminum) includes casters ¥12,000 Sign stand ¥1,600 ¥4,000 1700 1470 1295 390 PS-91 550 A: A4 6 pockets ¥4,800 B: A4 12 pockets ¥5,600 C: B4 12 pockets ¥5,600 COLOR/silver (chrome plated) 350 270 SIZE/W270×H350×H1470 COLOR/silver (aluminum) 4 pockets SIZE/W230×D200×H415 COLOR/smoke (acrylic) PS-121 PS-93 An asterisk (*) indicates that the item requires electricity. 75 SIZE/W500×D430×H920—1440 COLOR/Frame: silver (chrome) Panel thickness: 25mm PS-39 Exhibitor must prepare a sign panel. MyPage “Package Booths/Additional Furnishings/Rental Options” Optional Deadline: October 23 (Thu) ※ All prices listed below do not include tax. Business Card Box Hanger ¥1,600 Wheeled wagon ¥120 each ¥6,000/¥4,000 SIZE/W200 X H150 Acrylic A: W590×D890 B: W450×D710 UA-4 Extinguisher M-61 ¥4,000 ¥6,000 ¥4,000 SIZE/#10 Dry Chemical (ABC) UT-30 UT-18A Water Cooler + Water Tank (11.4L)* Refrigerator* ¥20,000/¥16,000/¥12,000 Water tank (11.4L) ¥12,000 ¥2,800 A. Refrigerator (L) 170L ¥20,000 SIZE/W525∼545×D580∼630×H1360∼1445 SPEC/170L, Power Consumption 150W A B C B. Refrigerator (M) 100L ¥16,000 SIZE/W415∼475×D500∼560×H1100∼1200 SPEC/100-106L, Power Consumption 100W Power Consumption Cooler: 115W Heater: 450W C. Refrigerator (S) 70L ¥12,000 SIZE/W405∼440×D430∼520×H790∼840 SPEC/70-74L, Power Consumption 70W UE-29 、30、31 UE-61 Plant (large) UE-62 Plant (small) Plant (medium) ¥3,500 A: W340×D360×H610 B: W340×D360×H970 ¥2,500 Monitor* ¥1,000 ¥60,000/¥120,000 1600 600 250 2000 1000 400 Pot Diameter: about 330mm Pot Diameter: about 150mm Actual plant may differ from photo. Actual plant may differ from photo. Monitor set* Actual plant may differ from photo. We will provide connectors and cables. ¥63,000/¥90,000/¥105,000/¥120,000 ¥103,500 B: 32” LCD with speaker, amp compatible with PC, DVD power consumption 150-360W ¥120,000 Projection screen set (small)* ¥87,000 We will provide connectors and cables. ¥57,000 ¥84,000 ¥99,000 ¥114,000 DVD Deck + A: 26“ ¥63,000 B: 32“ ¥90,000 C: 37“ ¥105,000 D: 45“ ¥120,000 power consumption 150-360W power consumption 160-370W A: 26“ B: 32“ C: 37“ D: 45“ Projection screen set (large)* DVD+monitor set* ¥57,000/¥84,000/¥99,000/¥114,000 ¥60,000 A: 20” LCD with speaker, amp compatible with PC, DVD Pot Diameter: about 330mm Roll-up Screen 100” Projector 3,000 ANSI lumens Hanging Screen 70” Projector 2,000 ANSI lumens power consumption 250W power consumption 250W We will provide connectors and cables. An asterisk (*) indicates that the item requires electricity. 76 We will provide connectors and cables. Optional MyPage “Package Booths/Additional Furnishings/Rental Options” Deadline: October 23 (Thu) ※ All prices listed below do not include tax. AV set 1* AV set 2* ¥20,500 Wired Mike Amp 1 1 Small Speaker power consumption 50W AV set 3* ¥20,500 1 Wired Headset Mike Small Speaker Amp AV set 4* ¥44,500 1 1 1 Wired Mike Amp Small Speaker power consumption 50W power consumption 200W An asterisk (*) indicates that the item requires electricity. 77 ¥44,500 1 1 2 Wired Headset Mike Amp Small Speaker power consumption 200W 1 1 2 15 Electricity Mandatory “Electric Supply and Installation” also submit “In-Booth Electrical Installation” plans Deadline: October 30 (Thu) (1) Electrical Installation by Organizer Send the application form noted above by the deadline to Shoho Denki for electrical installations. (You can send by fax or upload from your “Exhibitor MyPage”.) Based on the capacity needed, the company will install the appropriate wiring up to the booth, including a power switch in the booth. As a matter of policy, one switch for each voltage ordered will be installed on either the left or right side of the back wall. If you wish the switch to be located elsewhere, clearly mark the location on the electrical installation diagram on your “In-Booth Electrical Installation” form. Right-of-Way for electrical cables Electrical cables are pulled up through access holes to the underground pits, and these holes are limited in number. We ask for your cooperation and understanding when these cables have to be laid through your booth. (2) Electrical Installation by Exhibitor Please perform all installations for interior lighting and power according to the plan submitted and approved before construction begins. All installation should occur concurrently with other Move-in activities and must be finished by noon (12:00) on December 2 (Tue). After that time no further electrical work will be permitted. Follow all relevant safety regulations and directives, particularly as regards to fire and hazard prevention, to see that accidents and damage occur to neither workers nor property. Fluorescents and high pressure mercury vapor lamps should have a capacitor installed. Neon lighting is not permitted. Do not place incandescent, resisters, and other heat generating equipment near combustible objects. The main power switch in the booth’s distribution panel must be equipped with a ground-fault interrupter. (3) Period of Electrical Power Supply December 2 (Tue) 8:00 - 22:00 December 3 (Wed) 8:00 - 18:00 December 4 (Thu) 8:30 - 18:00 December 5 (Fri) 8:30 - 17:15 Electric is turned off at 17:15 on the last day of the show. Be sure to end all activities by this time. (4) Supply Specifications AC single phase, 100V 50Hz AC single phase, 200V 50Hz AC triple phase, 200V 50Hz Special voltage and hertz ranges other than the above are not permitted. If you want to bring in a transformer with a capacity greater than 20KVA, inform Shoho Denki and follow their instructions. (This also requires permission from Big Sight Convention Center.) (5) Fees for Trunk Line Installation (tax not included) Power Installation Power Installation up to1kW ¥8,000 5.1kW - 6.0kW ¥48,000 1.1kW - 2.0kW ¥16,000 6.1kW - 7.0kW ¥56,000 2.1kW - 3.0kW ¥24,000 7.1kW - 8.0kW ¥64,000 3.1kW - 4.0kW ¥32,000 8.1kW - 9.0kW ¥72,000 4.1kW - 5.0kW ¥40,000 9.1kW - 10.0kW ¥80,000 Installation of power above 10.01kW will incur an additional fee of ¥8,000/kW (tax not included). Fees are the same for both single phase 100V and single/triple phase 200V lines. (6) Fees for Electric Usage You will be billed by Show Management after the exhibition ends. Basic price will be based on your submitted application for capacity, load, and time used at ¥3,000/kW (tax not included). In the event of electricity rate change, the fee will reflect the change when it occurs. 81 (7) Early Switch-On If you need electric power before December 2 (Tue) in order to adjust and test-run equipment, request it in writing by October 30 (Thu). Remember that early switch-on time depends on how fast electrical subcontracting work is progressing. Depending on state of installation progress, early switch-on may not be possible, or you may have to pay additional fees. Contact Shoho Denki Co., Ltd. for further details. (8) 24-Hour Electrical Supply You can apply for continuous 24-hour electrical supply during show days (December 2-4 only) thru the “Electric Supply and Installation” page on your Exhibitor MyPage. Additional charges apply. (9) Power Lines Inspection of Electrical Installations The show organizers will follow all relevant technical guidelines for electrical equipment from the Ministry of Economy, Trade and Industry, and will comply with the Fire Service Act. Maintenance and Safety Electrical maintenance staff will be on-duty at the Show Management throughout the show. The Show Management assumes no responsibility for any damage to equipment or exhibits for demos caused by blackouts or brownouts due to power or voltage failures or accident. Exhibitor is responsible for surge protection and other safety devices during demo. Exhibitor should take steps to protect demo equipment which cannot function without constant voltage and frequency. (10) Electrical Constructing Work Inside Booths Optional MyPage “In-Booth Electrical Installation” Deadline: October 30 (Thu) List all electrical constructing work in the booth including lighting, outlets and power distribution on the “Electric Supply and Installation” page of your Exhibitor MyPage, and fax in the in-booth electrical installation form showing placement of all electrical equipment and devices, by October 30 (Thu). Sketch the symbols below on your electrical diagram to show desired placement. Symbol Fluorescents FL40W ¥2,500 Symbol Symbol CDM70W ¥9,000 Symbol 100W fluorescent bulb ¥3,500 Symbol CDM70W Arm Spotlights 100W fluorescent bulb ¥2,500 Symbol HID150W HID150W ¥12,000 Spotlights Symbol Halogen spotlights halogen bulb 100W ¥3,500 outlet under 100V 1,000W ¥3,000 Prices do not include tax but do include installation, wiring, and removal. A distribution panel must be installed if total power consumption by all lighting and outlets exceeds 1,500 Watts. Cost of panel installation is 1,500W/¥5,000 (tax not included). Other options are also possible. Contact Shoho Denki for further details. • If a package booth is purchased, you still must submit the “Electric Supply and Installation” form. Check the “Using Package Booth” box on the form and submit. • Changes to your electric power setup are not permitted during the exhibition. Make sure all your needs are fully covered before submitting the form. <Contact for Electrical Installations> SHOHODENKI Co., Ltd. Contact person: Tokita, Ito, Suzuki Tel: 03-3918-7993 / Fax: 03-3918-7800 / Email: semicon@shohodenki.co.jp 82 16 Water Supply and Drainage Optional “Water and Air” also submit floor and elevation plans Deadline: October 30 (Thu) (1) Main Plumbing Plumbing will be run to each booth as needed. A connecting pipe from the main water line, one connection per booth, will lead to the nearest edge of each booth. Pressure at the booth is 2.0-4.0 kg/cm2. Pressure is not regulated so make sure to install your own regulator if needed. You should also equip your line with filters and other protectors to prevent contamination with foreign particles and pressure variations. Do not drain hot water, solid particles, oils, pharmaceuticals or inks into the drainage pit as this may contaminate , clog, or cause backflow in the drainage plumbing. The exhibitor will be billed for the repair and/or cleanup resulting from such damage. Show Management assumes no responsibility for any damage to equipment or products due to contaminated water. Standard Water Supply and Drainage: Supply: 13mm, 20mm, 25mm valve stop (female screw) 2.0-4.0 kg/cm2 range (variation due to volume used/ not equipped with regulator) Drainage: 40mm, 50mm 0-40°C (no drainage above 41°C of any solid particles, oils, pharmaceuticals or inks) Fee for Main Plumbing (tax not included): ¥73,000 per company per location up to the booth border (includes maintenance fee) Water usage fee not included. Main plumbing comes from the equipment pit. Extension of lines to subpits falls under secondary plumbing. (2) Exhibitor Plumbing Work/Booth Interior Work (Secondary plumbing) Exhibitor is responsible for all plumbing within the booth interior. You can apply for secondary plumbing along with primary plumbing work. (You will receive a separate quotation for this. Please send a floor plan of your booth.) All plumbing subcontractor work must be performed concurrently with all other Move-in activities and must finish by noon of December 2 (Tue). No work allowed after that time. Notes • No exhibitor can use the water facility (the pits) directly without intermediary plumbing. Show Management assumes no responsibility for any accidents or damage resulting from such unauthorized use. • When the pit has been used, it must be cleaned. If not cleaned, you will be billed for any cleaning expenses. • To prevent extreme hazard, plumbing cannot be installed in the electrical pits. (3) Period of Water Supply December 2 (Tue) December 3 (Wed) December 4 (Thu) December 5 (Fri) 10:00 - 22:00 9:00 - 18:00 9:00 - 18:00 9:00 - 17:15 Outside these scheduled periods of supply, water is kept shut off at the main cock. (4) Early Water Supply If you need water supply before 10:00 on December 2 (Tue) in order to adjust and test-run equipment, please let us know as early as possible. Remember that early supply depends crucially on how fast plumbing installation work is progressing. Depending on state of progress of early switch-on, water supply may not be possible. (5) Water Supply Outside Regularly Scheduled Hours The water supply period can be extended, on December 2-4 (Tue-Thu), until 22:00. Contact us beforehand to arrange this. Applying for additional water supply on-site will require a separate consultation with the Show Management. All water will be shut off at 17:15 on December 5 (Fri). (6) 24-Hour Supply Contact us beforehand if you need continuous 24-hour water supply. (7) Cancellation of Installation and Equipment Leases There is no charge for cancellation of installation and rental equipment up to 1 week before the start of the exhibition, November 25 (Tue). After that you will be billed for the full amount. <Contact for Water and Air Supply> Yamazaki Kogyo Co., Ltd. Contact person: Daisuke Ishizuka , Oota Tel: 03-5305-5091 / Fax: 03-5305-5092 / Email: daisuke@yamazakikogyo.com 83 17 Compressed Air Optional “Water and Air” also submit floor and elevation plans Deadline: October 30 (Thu) (1) Air Supply (Main Installation) Main air lines will be run to each booth as needed. One line per booth, and the line will run up to the nearest booth border. Air is not oil-free but is pumped through an oil-cooled compressor, so dryers and filters have been installed to remove as much particulate matter as possible. However cleanliness of the air is not guaranteed: the exhibitor should also install filters and dryers on their side to reduce contaminants entering their equipment. Show Management assumes no responsibility for damage to exhibitor equipment due to air supply contaminants. Standard air: dry air, around 0.50 – 0.65Mpa (pressure depends on air use/pressure not regulated.) Standard sizes: 15A, 20A, 25A (all 3 types use female screw valve, size depends on volume used) Air volume: 300 liters/min or less (extra charge for volumes higher than 300 liters: ¥5,000/100 liters/min, tax not included). When requesting higher air volumes, note your specific needs accurately on the application form. Air dryers and oil filters are used, but recommend installing these in the booth as well. Fee for main installation: 75,000 per company per booth (tax not included, includes maintenance fee), line installed up to the booth edge. As a matter of policy main air is supplied from the pits. Laying of air hoses in the electrical pits or subpits falls under Secondary Installation work. (2) Exhibitor Air Installation/Booth Installation (secondary air installation). Exhibitor is responsible for all air installation within the booth. You can request this work to be done along with the main installation work (you will be quoted separately for this – please send a floor plan). All work must be done concurrently with all other Move-in activities and must be finished by noon, December 2 (Tue). No work permitted after this time. Note: always install filters and dryers to prevent water, oil and other foreign substances from contaminating your equipment. (3) Lease of compressors, driers, and filters These items can be leased. Supplies are limited so please confirm availability when applying. (4) Air Supply Schedule December 2 (Tue) December 3 (Wed) December 4 (Thu) December 5 (Fri) 10:00 - 22:00 9:00 - 18:00 9:00 - 18:00 9:00 - 17:15 ※ Outside the hours shown on the left, the compressor valve will be closed at the main valve outside the booth. (5) Early Air Supply (charged) If you need air before 10:00 on December 2 (Tue) in order to adjust and test-run equipment, please let us know as early as possible. Remember that early supply depends crucially on how fast air line installation work is progressing. Depending on state of progress we may not be able to supply air on the date of your request. (6) Air Supply Outside Scheduled Hours (charged) The air supply period can extended, on December 2-4 (Tue-Thu), until 22:00. After 22:00, or for 24-hour supply, you will need to install a compressor in the booth. Please contact us beforehand as this may be difficult to arrange onsite. ※ All air will be shut off at 17:15 on the last day, December 5 (Fri). (7) Prices for Air Supply Outside Scheduled Hours (charged) • 9:00 – 18:00 • 18:00 – 20:00 • 20:00 – 22:00 ¥2,500/h ¥5,000/h ¥7,000/h ※ before December 2 (Tue) ※ except for December 2 (Tue) ※ no supply after 22:00 (8) Cancellation of Installation and Equipment Leases There is no charge for cancellation of installation and rental equipment up to 1 week before the start of the exhibition. After that you will be billed the full amount. 84 18 Naked Flame and Hazardous Materials Optional “Naked Flame and Hazardous Materials” mail in needed documentation Deadline: October 23 (Thu) • The Japanese Fire Service Act forbids the use of naked flame and the conveyance of hazardous materials into exhibition halls. However, when hazardous materials or naked flame are required for the proper demonstration of company products, these materials are allowed in to use only when proper authorization is first obtained from the Fukagawa fire authorities. The Show Management will arrange to collect all such applications for authorization and submit them on behalf of exhibitors. Be aware that submission past the deadline may result in denial of the request. • Please be aware that local fire authorities may conduct spot inspections during move-in and during the exhibition itself. If exhibitors are found to be using unapproved hazardous materials, or to be in violation of fire regulations, or to have unfinished installations, they may be required to tear down such installations. • When applying for a fire or hazardous materials exemption, you must supply a drawing showing the usage and storage locations of all these materials along with the location of fire extinguisher in the booth, catalogs for each material and/or equipment, the total energy of the materials (kW), a detailed description of the demonstration in which it is used, and MSDS documentation for all hazardous materials. Send all these materials in triplicate by mail, or by email send one copy in PDF form, to the SEMICON Japan Show Management Support by October 23 (Thu). • Restrictions on devices producing sparks are particularly severe; if you plan on using such equipment, contact the Office beforehand for details: there will be more documents required in this case. (1) Exemptions Smoking Absolutely no smoking in the exhibition halls (no exemptions). However, smoking is permitted at Big Sight in the designated smoking areas. Use of Naked flame Definition of Use of Naked flame a. Anything that uses gas, liquid, or solid materials to produce spark or flame, including those components of devices which produce spark or flame in the open. b. Devices which use electricity as a heat source that produce heated visible parts (excluding devices like hot plates, hair dryers and ovens etc. in which the heating element heats an enclosed space, a blower, or an interior part) and may cause combustion when the exposed heating element comes in contact with combustible materials (surface temperatures exceeding 400°C). <Requirement for Use of Naked flame> • If naked flame is absolutely necessary for proper demonstration or exhibit, we ask that you limit its use to the barest minimum. • Use of candles or alcohol lamps for decorative purposes is not permitted. • Separate consultation beforehand is also required if you plan to use gas in the booth. <Location of Use> • Always keep combustible materials a safe distance away from naked flame sources. • Keep flammables and hazardous materials at least 5 meters away from all entrances and stairways, and from other flammables. <Safety Measures> • Do not place any combustible materials within 15 cm of the side or back of the naked flame generating device, or within 100cm above it. If some material cannot avoid being placed within 15 cm of the device, that area must be isolated with a special fire-retardant materials. In such a case, make sure this material is not in contact with the booth partitions. Example: use 2 asbestos corrugated plates of greater than 15mm thickness in this area. • Install safety devices that help extinguish the flame and prevent tipping during earthquakes. • Install safety devices that automatically shut off gas sources of flame during an earthquake, and install gas leak alarms. • Always keep ABC extinguishers (capacity 2 or above, type 10 or above) ready at hand. • Train personnel to use the extinguishers properly. • Use cartridge type containers or liquid natural gas. • The length of flame produced by any device is limited to 10cm or less. • When using liquid fuel, use the absolute minimum necessary. No refilling while the exhibition is in progress. • Implement safety measures to reduce the risk of fire damage or personal injury due to naked flame. 85 Use of Hazardous Materials <Definition of Hazardous Materials> a. Hazardous Materials Materials defined by the Fire Service Act to be hazardous, including combustible liquids like gasoline, diesel oils and oxidizing solids and liquids. b. Designated combustibles Combustible liquids and solids as defined by the Tokyo Metropolitan Fire Prevention Ordinance (Tokyo Ordinance 65), addendum graph 7. c. Explosives Gunpowders, blasting powders, industrial processing explosives and fireworks as defined by the Gunpowder Control Act. d. Propane, acetylene, hydrogen, ammonia and other combustible gases as defined by the General High Pressure Gas Safety Ordinance. <Materials Not Considered Hazardous> • Exhibition items (limited to items displayed only and not demonstrated, which remain in their containers). • fuels or lubricants held inside the tanks of vehicles on display. • lubricants held inside tanks of motors or hydraulic equipment on display. • art or decorative objects used as display objects, made of paraffin, which is a solid combustible. • oils used on frying pans or baking sheets such as vegetable oils used in cooking (except for deep-frying). • anti-bacterial or disinfectant alcohols with an alcohol content of 60% or less. <Placement of Hazardous Materials> • Hazardous materials must be placed at least 6 meters away from entrances and stairways, and at least 3 meters away from other hazardous materials. However, exception is made for walls treated with fire-retardant materials. • Hazardous materials must be placed at least at least 5m horizontally away from any place where fire is used. However, exception is made for walls treated with fire-retardant materials. <Safety Measures> • An inspection and post-use safety check system should be implemented by responsible personnel. • Always keep ABC extinguishers (capacity 2 or above, type 10 or above) ready at hand. • Install exhaust systems to direct any combustible vapors produced away from and out of the booth. • Install systems to prevent the accidental spillage of hazardous liquids if a device or equipment utilized for demo is prone to cause such a spillage. Also make sure to use non-combustible materials for such preventive systems. • Storage of hypergolic fuel components in the same location is prohibited. (These are fuel components that ignite upon combination, like rocket fuels.) • No refilling of hazardous liquids during the exhibition. • Fill the tanks of vehicles on display with the absolute minimum of fuel needed. • When storing seal tightly and place in location well away from other items. • Take all safety precautions necessary to ensure a safe booth environment. Inspection by Local Fire Authorities • We will inform you when the inspection will take place. • The authorities will be going from booth to booth during the inspection, so it may take them some time to get to your booth. Personnel responsible for, and able to answer questions about, booth safety must be present in the booth when the authorities arrive for inspection. • If no one is in the booth at inspection time, or equipment/installations applied for are still not present, or the conditions are different than those described on the application, not only may your demonstrations not be approved, but all the exemptions you applied for may be withdrawn. Make sure that your personnel have fully practiced their demonstrations and all equipment, installations, and fire prevention equipment are in place. (2) Submitting Application for Use of Naked Flame Fill out the relevant portions and FAX in the “Naked Flame and Hazardous Materials” form, then mail in the following documentation to the SEMICON Japan Show Management Support. • Booth floor plan (showing equipment set up, place of use, location of fire extinguishers) • Detailed catalog describing the equipment or objects being demonstrated 3 copies • Simple description of demo procedures and daily schedule of demos 3 copies 86 3 copies (3) Submitting Application for Use of Hazardous Materials Fill out the relevant portions and FAX in the “Naked Flame and Hazardous Materials” form, then mail in the following documentation to the SEMICON Japan Show Management Support. • Booth floor plan (place of use and storage, location of fire extinguishers) 3 copies • Containers If storage will be inside equipment to be demoed, send a catalog of that equipment, and a simple description of the demo and oil contained within. (However, if oil is completely contained inside the equipment and never refilled, there is no need to submit this application.) 3 copies each if demo equipment will be refilled from separate containers such as cylinders, note their location on the floor plan, and describe status of their storage (safety measures to avoid tipping, etc. ) 3 copies ※ There is no need to submit applications for cylinders containing nitrogen or argon gas. • List of personnel in charge of hazardous material management (note this on the application form) ※ A #10 or larger fire extinguisher must be installed within the booth. * An MSDS statement is also required. (4) Handling Hazardous Materials • You can only bring in just enough material for use during that day of the exhibition. • Do not refuel equipment during exhibition hours. • Do not leave empty containers within the booth. • Install a #10 or larger extinguisher in the booth and post a sign indicating its location. Further Restrictions Categories of Hazardous Materials Application for exemption does not guarantee authorization. Some requests may be denied. Additional submission of application is not allowed; make sure you submit all documentation for all hazardous materials before the deadline. Local fire authorities will conduct a fire inspection on December 2 (Tue). They will be inspecting all naked flame and hazardous material installations, so please have the proper personnel present in the booth at this time. Class 1. Petroleum products (gasoline, paint thinner) Class 2. Petroleum products (kerosene, diesel oil) Class 3. Petroleum products (heavy oil, machine oil) Class 4. Petroleum products (gear oil, lubricating oil) Other naked flame and hazardous materials ※ Spray cans, ink oil, paint and similar. ※ Oils contained within demo equipment are not considered hazardous. <Contact: Naked Flame and Hazardous Materials Applications and Documentation> SEMICON Japan Show Management Support (Sakura International, Inc.) Fukagawa Sanwa Bldg 4F, 2-5-9 Monzennaka-cho, Koto-ku, Tokyo, Japan 135-0048 Tel: 81-50-5804-1281 Fax: 81-3-5646-1161 Email: semicon2014@sakurain.co.jp Business hours: Daily 9:30 – 17:00 (closed weekends/holidays) 19 Booth Cleaning Optional MyPage “Booth Cleaning” Deadline: November 13 (Thu) (1) Cleaning Fee 1 booth unit/day ¥600 (tax not included) ※ Only carpeting is cleaned (with a vacuum cleaner), showcases and exhibits are not included in the fee. ※ Fee is based on total booth space rented, whether all space is accessible or not. (2) Cleaning Schedule December 2 (Tue) starting early evening December 3 (Wed) starting 18:00 (after exhibition area is closed) December 4 (Thu) starting 18:00 (after exhibition area is closed) ※ Partial cleaning orders are not allowed. Cleaning must be ordered for the entire 3 day period scheduled. <Contact for Cleaning> In Support Contact person: Goto Tel: 03-5683-3886 / Fax: 03-5683-3887 / Email: goto@yellow.interq.or.jp 87
© Copyright 2026